Steel
India and USA
JSW Steel Logo
36,108
Hours of unplanned downtime saved

JSW Steel rolled PlantOS™ out across 139 plants in India and
the USA and cut unplanned downtime 2X in under a year.


Read the JSW Steel story


Chemicals
USA and APAC
Indorama Ventures Logo
862
Hours of unplanned downtime saved

Across 14 plants, Indorama Ventures caught developing equipment faults early with PlantOS™ and cleared them during planned
shutdowns instead of forced ones.


Read the Indorama Ventures story


Tire Manufacturing
Mexico
JK Tornel Logo
$46,245
Annual maintenance savings

JK Tornel acted on PlantOS™ vibration alerts on its Banbury
mixer line early enough to schedule repairs instead of absorbing a line
stoppage.


Read the JK Tornel story


Mining & Metals
India
Vedanta Logo
3X ROI
in under 12 months

Vedanta Group used PlantOS™ to intervene on failing assets
before they stopped production, converting avoided breakdowns into
recovered output.


Read the Vedanta Group story


Cement
Saudi Arabia
Southern Province Cement Company Logo
9X ROI
in under 6 months

SPCC replaced reactive firefighting with a daily prioritized work order queue from PlantOS™ and fixed critical assets
before they failed.


Read the SPCC story


Chemicals and Fertilizer
India
Coromandel Logo
3,210
Hours of unplanned downtime saved

With PlantOS™ live across 27 plants, Coromandel International
planned maintenance around real asset health and took equipment down on
its own schedule, not the failure’s.


Read the Coromandel International story