Resources
Case Studies
India and USA

36,108
Hours of unplanned downtime saved
JSW Steel rolled PlantOS™ out across 139 plants in India and
the USA and cut unplanned downtime 2X in under a year.
USA and APAC

862
Hours of unplanned downtime saved
Across 14 plants, Indorama Ventures caught developing equipment faults early with PlantOS™ and cleared them during planned
shutdowns instead of forced ones.
Mexico

$46,245
Annual maintenance savings
JK Tornel acted on PlantOS™ vibration alerts on its Banbury
mixer line early enough to schedule repairs instead of absorbing a line
stoppage.
India

3X ROI
in under 12 months
Vedanta Group used PlantOS™ to intervene on failing assets
before they stopped production, converting avoided breakdowns into
recovered output.
Saudi Arabia

9X ROI
in under 6 months
SPCC replaced reactive firefighting with a daily prioritized work order queue from PlantOS™ and fixed critical assets
before they failed.
India

3,210
Hours of unplanned downtime saved
With PlantOS™ live across 27 plants, Coromandel International
planned maintenance around real asset health and took equipment down on
its own schedule, not the failure’s.